Changzhou New Top Star New Material Technology Co.,Ltd

Changzhou New Top Star New Material Technology Co.,Ltd

Manufacturer from China
Verified Supplier
3 Years
Home / Products / Flooring Vapor Barrier /

6 Mil Polyethylene Film Flooring Vapor Barrier Low Density Plastic Sheeting

Contact Now
Changzhou New Top Star New Material Technology Co.,Ltd
Visit Website
City:changzhou
Country/Region:china
Contact Person:carol
Contact Now

6 Mil Polyethylene Film Flooring Vapor Barrier Low Density Plastic Sheeting

Ask Latest Price
Video Channel
Brand Name :new top star
Model Number :6mil thick poly film
Certification :Rohs.REACH.ISO
Place of Origin :china
MOQ :1000SQ.M.
Price :0.3USD/sq.m.
Payment Terms :L/C, T/T
Supply Ability :2000000sq.m. per month
Delivery Time :5-8 work days
Packaging Details :shrink-wrapped
Material :6 Mil Polyethylene Film Moisture Barrier
Thickness :6mil
Density :90kg/m3
Feature :Comfort
Advantage :Comfort Step, Noise Reduction
Roll Size :10m2
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

6-Mil Plastic Sheeting Construction Film Underlayment

Description:

6 Mil Polyethylene Film is a low density Polyethylene film that can be used during the installation process with floating laminate and engineered wood floors. No need to bother with large fold-out, low quality, off-spec, construction grade films, which are bothersome and hard to use before the floor is installed.

6 Mil Polyethylene Film Flooring Vapor Barrier Low Density Plastic Sheeting

Application

6 Mil Polyethylene Film is also recommended for use with pre-attached floating wood floors in which the padding is attached to the floor during the manufacturing process. While installing a pre-attached padded floor, it is recommended to also install a moisture resistant film over concrete or any substrait where moisture is a concern.

6 Mil Polyethylene Film Flooring Vapor Barrier Low Density Plastic Sheeting

Feature

  • Heavy-duty plastic sheeting
  • Advanced tear and puncture resistant multi-layer polyethylene
  • Tear and puncture resistant

Installation Instructions

  1. Before rolling out the underlayment, be sure to sweep, vacuum, and remove all debris on the substructure.
  2. Fill in any significant holes, gaps or breaks that may exist on the substructure.
  3. Roll out the Underlayment over the substructure surface.
  4. Splice each roll of underlayment with a 3 mil tape, duct tape, or similar pressure-sensitive tape that meets/exceeds the water vapor transmission ratings suggested by the flooring manufacturer.
  5. If installing MoistureBlock Film Underlayment with Self-Sealing film edge, simply connect the rolls by removing the liner from the tape and adhere to the edge of the previous roll.
  6. Always be sure to connect the film rolls together with the adhesive tape evenly so that there are no gaps between the adjoining rolls of film.

Inquiry Cart 0